NEBB Certifed Testing, Adjusting, and Balancing, Building Systems Commissioning, and Sound and Vibration Measurement
Austin / Manchaca, TX
P.O. Box 129
Manchaca, TX 78652
ph: (512) 280-3398
Chad
Over the course of it's 20 year history 789bet link has completed more than 5,000 projects ranging in size and scopeÌýfrom small commercial to heavy industrial.Ìý Listed below is a summary of some of these projects.
These projects entailed the testing, adjusting, and balaning of newly constructed large industrial cleanroom production facilities.Ìý Each of these buildings has aÌýlarge and complex mechanical system including large central station VAV air handling units, large central station cleanroom air handling units, cooling only teminal units, fan powered terminal units equipped with hot water reheat, numerous fan powered and non-fan powered HEPA filters, primary-secondary chilled water sytems, and hot water reaheating systems.
This project consisted of the construction of a large new classroom and office building. ÌýSystems tested include chilled and heating water systems, very large central station air handling systems, terminal units with hot water reheat, chilled beams, and exhaust systems. Ìý

This project consisted of testing, adjusting, and balancing a newly constructed four-story city hall building and its associated parking structure.Ìý The mechanical systems tested include both constant and variable volume chilled water air handling units, numerous constant and variable volume exhaust systems, a chilled water system, and a smoke control system.
The scope of this project incldued the testing, adjusting, and balancing of a new Federal Courthouse Building in Austin, TX. Ìý The systems involved included chilled and heating water systems, central station air handling units, terminal units, and a domestic water circulation system. Ìý

This project consisted of testing, adjusting, and balancing a newly constructed temporary housing facility for the families of ill children being treated ad the Dell Children’s Hospital in Austin Texas.Ìý The mechanical systems tested included numerous chilled and hot water fan coil units, a heat recovery system, a chilled water system, a heating hot water system, and a large domestic hot water circulating system.
This project consisted of testing, adjusting, and balancing a newly constructed 42-story high-rise condominium complex in central Austin.Ìý The mechanical systems tested include numerous chilled water fan coil units, constant volume exhaust systems, smoke control systems, a chilled water system, and a large domestic hot water circulation system.
This project consisted of testing, adjusting, and balancing a renovated turn of the century courthouse in Georgetown, Texas.Ìý The mechanical systems tested included a dual duct air handling unit, dual duct terminal boxes, constant volume exhaust systems, a chilled water system, and a hot water system.
The VA Outpatient Clinic project consisted of testing, adjusting, and balancing a large new hospital facility in South Austin. ÌýThe systems tested included chilled and heating water systems, central station air handling units, terminal units with hot water reheat, extensive exhaust and room isolation systems. Ìý

Copyright 2010 789bet link. All rights reserved.
P.O. Box 129
Manchaca, TX 78652
ph: (512) 280-3398
Chad